When investing in 5 gallon (≈18.9L) bottled water production equipment with limited funds, prioritize cost efficiency, core functionality, and scalability. Here’s a step-by-step guide:
Essential components: At minimum, you’ll need a water treatment system, filling machine, capping machine,Skip high-end automation initially.
Phase 1 (Essentials):
Water treatment: Small reverse osmosis (RO) system .
Semi-auto filling machine: Manual bottle loading + semi-auto filling.
Phase 2 (Expansion): Add automated bottle cleaners, full-auto fillers, etc.
Space: A 40–60 m² facility (low-rent areas) meets hygiene standards.
Labor: Use semi-auto machines and hire minimal staff for loading/unloading.
Water source: Municipal water (lower treatment costs) over wells.
Bottles: Refurbished PC barrels (strict sanitation) or PET barrels.
Equipment | Type | Estimated Cost |
---|---|---|
Water Treatment | Small RO + Ozone | 3500USD |
Filling Machine&Capping machine | Semi-auto (100 b/h) | 1700USD |
Pure water tank | PE water tank | 200USD |
Brush washing machine | Semi-auto | 1000USD |
Auxiliary (Air Compressor, etc.) | — | 200USD |
Total | 6600USD |